St. Charles County · clay lot stationSheet 09 · O'Fallon, MO
O'FallonLot StationO'Fallon line636-246-7794
Field Index
636-246-7794
16 focused decision guides

Explore the water path by job, not jargon.

Begin with the wet zone or the symptom. Each guide separates soil, grade, collector, outlet, restoration, and closeout records.

Request a drainage review
A

Collect below the lawn

French drains, standing water, and foundation-yard collectors.

B

Catch sheet flow

Yard drains, basins, channels, swales, and driveway inlets.

C

Correct the surface

Regrade, cut, fill, and the city cubic-yard threshold.

D

Release the water

Downspouts, pop-ups, sump lines, and planned outlets.

E

Find the failed layer

Clogged socks, crushed pipe, lost pitch, and dead outlets.

F

Coordinate a site

Parking lots, private storm lines, and occupied access.

One composed scope

Water must leave the lot on purpose.

A useful proposal follows the path from wet zone to legal release and assigns collector, pipe, restoration, permit, and first-storm duties.

Start with a French drain